A metering pilot has begun in two urban sectors, replacing flat-rate billing with volumetric charging across roughly four thousand connections.
The board says the exercise is primarily diagnostic. Unaccounted-for water in the pilot area has been estimated at a substantial share of supply, and metering is intended to establish where it is lost.
Resident concerns
Residents’ associations have sought assurance that volumetric billing will not be extended before leak repair is complete, arguing households should not pay for losses in the distribution network.
Findings are due within a year.


